~Event Calendar
OFFICIAL WEBSITE OF THE CITY OF PROVIDENCE, RHODE ISLAND
View Events for:
»« May 2013
S M T W T F S
      01 02 03 04
05 06 07 08 09 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  


   City Council Calendar
  ProvConnex

Visit a City Department:
Wednesday, May 1, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Thursday, May 2, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Friday, May 3, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Saturday, May 4, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Sunday, May 5, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Monday, May 6, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Tuesday, May 7, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Wednesday, May 8, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Thursday, May 9, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Friday, May 10, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Saturday, May 11, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Sunday, May 12, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Monday, May 13, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Tuesday, May 14, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Wednesday, May 15, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Thursday, May 16, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Friday, May 17, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Saturday, May 18, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Sunday, May 19, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
 
Monday, May 20, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
 
Tuesday, May 21, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
 
Wednesday, May 22, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
 
Thursday, May 23, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
Street Closure Euclid St. will be closed between Brook St. and Thayer St. Brown University is hosting their Senior Week/ Last walk   Euclid Ave.
Providence, RI
05/23/2013 – 05/24/2013
6:00 pm - 2:00 am
Street Closure Thayer St. will be Closed between Cushing St. and Angell St. Brown University is Hosting their Senior Week/ Last Walk Thayer St.
Providence, RI
05/23/2013 – 05/24/2013
6:00 pm - 2:00 am
Street Closure Meeting St. will be Closed between Brook St. and Brown St. Brown University is Hosting their Senior Week/ Last Walk Meeting St.
Providence, RI
05/23/2013 – 05/24/2013
6:00 pm - 2:00 am
 
Friday, May 24, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Sidewalk Closure The Sidewalk will be Closed at Acorn St. and Trainor St. 24 hours a day 7 days a week Sun  Builders INC is working in the area Acorn St.
Providence, RI
05/24/2013 – 06/23/2013
6:00 am - 8:00 pm
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
Street Closure Euclid St. will be closed between Brook St. and Thayer St. Brown University is hosting their Senior Week/ Last walk   Euclid Ave.
Providence, RI
05/23/2013 – 05/24/2013
6:00 pm - 2:00 am
Street Closure Thayer St. will be Closed between Cushing St. and Angell St. Brown University is Hosting their Senior Week/ Last Walk Thayer St.
Providence, RI
05/23/2013 – 05/24/2013
6:00 pm - 2:00 am
Street Closure Meeting St. will be Closed between Brook St. and Brown St. Brown University is Hosting their Senior Week/ Last Walk Meeting St.
Providence, RI
05/23/2013 – 05/24/2013
6:00 pm - 2:00 am
 
Saturday, May 25, 2013
Event Details Location Time
Parking Lane Closure The Parking Lane will be Closed at North Main St. between Amos St. and College St. Providence Waterfire. For more information please visit the website below http://waterfire.org/visit/map/ North Main St.
Providence, RI
05/25/2013 – 05/26/2013
5:00 am - 2:30 am
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Sidewalk Closure The Sidewalk will be Closed at Acorn St. and Trainor St. 24 hours a day 7 days a week Sun  Builders INC is working in the area Acorn St.
Providence, RI
05/24/2013 – 06/23/2013
6:00 am - 8:00 pm
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
Street Closure Canal St. will be Closed between Steeple St. and Washington St. Providence Waterfire, for more information please go to the website below http://waterfire.org/visit/map/   Canal St.
Providence, RI
05/25/2013 – 05/26/2013
5:00 am - 2:30 am
Street Closure Washington St. will be closed between Memorial Blvd. and North Main St. Providence Waterfire. For more information please go to the website below. http://waterfire.org/visit/map/ Washington St.
Providence, RI
05/25/2013 – 05/26/2013
5:00 am - 2:30 am
Street Clousre College St. will be Closed between Memorial Blvd. and South Main St. Providence Waterfire. For more information please visit the website below. http://waterfire.org/visit/map/ College St.
Providence, RI
05/25/2013 – 05/26/2013
5:00 am - 2:30 am
 
Sunday, May 26, 2013
Event Details Location Time
Parking Lane Closure The Parking Lane will be Closed at North Main St. between Amos St. and College St. Providence Waterfire. For more information please visit the website below http://waterfire.org/visit/map/ North Main St.
Providence, RI
05/25/2013 – 05/26/2013
5:00 am - 2:30 am
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Sidewalk Closure The Sidewalk will be Closed at Acorn St. and Trainor St. 24 hours a day 7 days a week Sun  Builders INC is working in the area Acorn St.
Providence, RI
05/24/2013 – 06/23/2013
6:00 am - 8:00 pm
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
Street Closure Canal St. will be Closed between Steeple St. and Washington St. Providence Waterfire, for more information please go to the website below http://waterfire.org/visit/map/   Canal St.
Providence, RI
05/25/2013 – 05/26/2013
5:00 am - 2:30 am
Street Closure Washington St. will be closed between Memorial Blvd. and North Main St. Providence Waterfire. For more information please go to the website below. http://waterfire.org/visit/map/ Washington St.
Providence, RI
05/25/2013 – 05/26/2013
5:00 am - 2:30 am
Street Clousre College St. will be Closed between Memorial Blvd. and South Main St. Providence Waterfire. For more information please visit the website below. http://waterfire.org/visit/map/ College St.
Providence, RI
05/25/2013 – 05/26/2013
5:00 am - 2:30 am
 
Monday, May 27, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Sidewalk Closure The Sidewalk will be Closed at Acorn St. and Trainor St. 24 hours a day 7 days a week Sun  Builders INC is working in the area Acorn St.
Providence, RI
05/24/2013 – 06/23/2013
6:00 am - 8:00 pm
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
 
Tuesday, May 28, 2013
Event Details Location Time
Restricted Parking There will be No Parking at 84 Benevolent St. Federal Van Lines moving services is working in the area. 84 Benevolent St.
Providence, RI
7:30 am - 1:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Sidewalk Closure The Sidewalk will be Closed at Acorn St. and Trainor St. 24 hours a day 7 days a week Sun  Builders INC is working in the area Acorn St.
Providence, RI
05/24/2013 – 06/23/2013
6:00 am - 8:00 pm
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
 
Wednesday, May 29, 2013
Event Details Location Time
One Travel & Parking Lane Closure One Travel & Parking Lane will be Closed along with the sidewalk at 36 Exchange Terrace. Imperatore Steel Erectors is using a crane to hoist equipment onto the roof. 36 Exchange Terrace
Providence, RI
6:00 am - 1:00 pm
Restricted Parking There will be No Parking at 195 Waterman St. Federal Van Lines will be moving a client. 195 Waterman St.
Providence, RI
7:00 am - 3:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Sidewalk Closure The Sidewalk will be Closed at Acorn St. and Trainor St. 24 hours a day 7 days a week Sun  Builders INC is working in the area Acorn St.
Providence, RI
05/24/2013 – 06/23/2013
6:00 am - 8:00 pm
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
 
Thursday, May 30, 2013
Event Details Location Time
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Sidewalk Closure The Sidewalk will be Closed at Acorn St. and Trainor St. 24 hours a day 7 days a week Sun  Builders INC is working in the area Acorn St.
Providence, RI
05/24/2013 – 06/23/2013
6:00 am - 8:00 pm
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
 
Friday, May 31, 2013
Event Details Location Time
Restricted Parking There will be No Parking on Pine St. (PPAC Side Only) between Page and Garnett St. Providence Performing Arts Center is having an event. Pine St.
Providence, RI
12:01 am - 11:59 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Sidewalk Closure The Sidewalk will be Closed at Acorn St. and Trainor St. 24 hours a day 7 days a week Sun  Builders INC is working in the area Acorn St.
Providence, RI
05/24/2013 – 06/23/2013
6:00 am - 8:00 pm
Street & Sidewalk Closure Clemence St. will be closed along with the sidewalk between Fountain St. and Worcester St. The RD Preservation Co. is working in the area. Clemence St.
Providence, RI
05/22/2013 – 06/07/2013
7:00 am - 3:30 pm
Street/Sidewalk Closure Pine St. will be Closed between Richmond St. and Page St. Providence Performing Arts Center is having an event     Pine St.
Providence, RI
12:01 am - 11:59 pm