Thursday, August 1, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Blundell St. between Pavillion St. and Thurbers Ave.   J.H. Lynch is Reclaiming and Paving Blundell St.
Providence, RI
08/01/2013 – 08/03/2013
6:00 am - 6:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk will be Closed at Westminster and Kennedy Plaza.   Westminster St.
Providence, RI
07/16/2013 – 08/01/2013
7:00 am - 5:00 pm
Sidewalk Closure The Sidewalk will be Closed at Westminster and Kennedy Plaza.   Westminster St.
Providence, RI
07/16/2013 – 08/01/2013
7:00 am - 5:00 pm
Sidewalk Closure The Sidewalk will be Closed at Westminster and Kennedy Plaza.   Westminster St.
Providence, RI
07/16/2013 – 08/01/2013
7:00 am - 5:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Friday, August 2, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Blundell St. between Pavillion St. and Thurbers Ave.   J.H. Lynch is Reclaiming and Paving Blundell St.
Providence, RI
08/01/2013 – 08/03/2013
6:00 am - 6:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Saturday, August 3, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Blundell St. between Pavillion St. and Thurbers Ave.   J.H. Lynch is Reclaiming and Paving Blundell St.
Providence, RI
08/01/2013 – 08/03/2013
6:00 am - 6:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Sunday, August 4, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Monday, August 5, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will be No Parking at 242 Wayland Ave. between Adelphi Ave and Angell St. 242 Wayland Ave.
Providence, RI
5:00 am - 10:00 pm
Restricted Parking There will be No Parking on Keene St. between 2 Keene St. and 107 Prospect St. 2 Keene St.
Providence, RI
08/05/2013 – 08/07/2013
5:00 am - 5:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Tuesday, August 6, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will be No Parking on Keene St. between 2 Keene St. and 107 Prospect St. 2 Keene St.
Providence, RI
08/05/2013 – 08/07/2013
5:00 am - 5:00 pm
Restricted Parking There will be No Parking on Jastram St. to Smith St. Jastram St.
Providence, RI
9:00 am - 8:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Roanoke St. will be Closed between Mount Pleasant Ave. and Leah St.   Community Block Party. Roanoke St.
Providence, RI
1:00 pm - 8:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Wednesday, August 7, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will be No Parking on Keene St. between 2 Keene St. and 107 Prospect St. 2 Keene St.
Providence, RI
08/05/2013 – 08/07/2013
5:00 am - 5:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk and One Travel Lane Closure 150 Washington St. will have One Travel Lane, the Parking Lane and Sidewalk Closed between Snow St. and Mathewson St.   Imperatore Steel Erectors will be using a crane. 150 Washington St.
Providencen, RI
7:00 am - 11:00 am
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Blackstone Blvd. will be Closed between Lorimer Ave. and Elmgrove Ave. Blackstone Parks Conservancy is hosting an Outdoor Concert. Blackstone Blvd.
Providence, RI
5:30 pm - 7:30 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Thursday, August 8, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Friday, August 9, 2013
Event Details Location Time
One Travel Lane Closure Fountain St. will have One Lane Closed between Clemence St. and Union St. The RD Preservation Co. Inc., is working on building elevation. Fountain St.
Providence, RI
07/16/2013 – 08/09/2013
7:00 am - 3:30 pm
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Restricted Parking There will be No Parking on either side of Ascham St. and Hawkins St.     National Grid Gas has a gas main replacement. Ascham St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Restricted Parking There will ne No Parking on Either side of Hawkins St. between Hall St. and Charles St.     National Grid Gas is working on a Gas main Replacement. Hawkins St.
Providence, RI
08/01/2013 – 08/09/2013
7:30 am - 6:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Saturday, August 10, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Rochambeau Ave. will be Closed between Steele St. and North Main St. Bethel A. M Church is having a block party Rochambeau Ave.
Providence, RI
6:00 am - 3:30 pm
Street Closure Snow St. will be Closed between Washington St. and Westminster. Alley Cat is Hosting a Block Party Snow St.
Providence, RI
08/10/2013 – 08/11/2013
8:00 am - 2:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Sunday, August 11, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street and Sidewalk Closure Pine St. will be Closed along with the Sidewalk between Richmond St. and Page St.   Providence, Performing Arts Center is Having an Event. Pine St.
Providence, RI
12:01 am - 11:59 pm
Street Closure Snow St. will be Closed between Washington St. and Westminster. Alley Cat is Hosting a Block Party Snow St.
Providence, RI
08/10/2013 – 08/11/2013
8:00 am - 2:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Monday, August 12, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Tuesday, August 13, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk Closure The Sidewalk at Hewes St. will be Closed between Stevens St. and North Main St. 24 hours a day 7 days a week. Stand Corp is doing construction work in the area Hewes St.
Providence, RI
05/20/2013 – 08/13/2013
9:00 am - 9:00 am
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Wednesday, August 14, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Thursday, August 15, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Friday, August 16, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Saturday, August 17, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Sunday, August 18, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Monday, August 19, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Tuesday, August 20, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Wednesday, August 21, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Blackstone Blvd. will be Closed between Lorimer Ave. and Elmgrove Ave. Blackstone Parks Conservancy is hosting an Outdoor Concert. Blackstone Blvd.
Providence, RI
5:30 pm - 7:30 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Thursday, August 22, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Friday, August 23, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Saturday, August 24, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Sunday, August 25, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Monday, August 26, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Tuesday, August 27, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Wednesday, August 28, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Thursday, August 29, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Friday, August 30, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am
 
Saturday, August 31, 2013
Event Details Location Time
Restricted Parking There will be No Parking on South Main St. between Packet St. and  College St. Chapel Building Corp. is working on the Entrance Renovation Project.   South Main St.
Providence, RI
07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Sidewalk & One Travel Lane Closure The Sidewalk and One Travel Lane will be Closed on Sunset Ave. between Killingly St. between Neutaconkanut Rd. RIDOT is working gin the area. Sunset Ave.
Providence, RI
07/15/2013 – 09/15/2013
6:30 am - 5:00 pm
Sidewalk Closure The Sidewalk will be closed 7 days a week 24hrs a day at 116 Broadway between Broadway and Carpenter St.   Case Construction is going to Demolish the former Engle Tire Bldg. 116 Broadway
Providence, RI
09/10/2012 – 08/31/2013
5:00 am - 5:00 am
Sidewalk Closure At India St. the Sidewalk will Be Closed to Gano St. Northeast Remsco is working on an Interceptor Project with Narragansett Bay Commission.   India St.
Providence, RI
10/18/2012 – 11/17/2013
6:00 am - 11:00 pm
Sidewalk Closure The Sidewalk at South Main St. between Packet St. and 121 South Main St. will be Closed for Renovations to the entrance of 155 South Main St. South Main St.
Providence, RI

07/16/2013 – 09/16/2013
6:00 am - 4:00 pm
Street Closure Public St. will be Closed between Allens Ave. East, to River, Dead End.   Charter Environmental is installing drainage improvements. Public St.
Providence, RI
07/01/2013 – 11/02/2013
7:00 am - 7:00 am